Quarry Update - Distance & Lake Project

This is another quick update on the quarry project in Villemoustaussou.

I’m trying to find the study about the project.  The DREAL office that conducted the preliminary studies is out of the office this week so I can’t get in touch with them until after the deadline for reading it.  There is a physical copy of the 300 page dossier in a box in the Chambre of Agriculture. which I can view up until tomorrow.  But I haven’t had a chance yet.

The Chamber of Agriculture assured me that if this were a risky operation, the DREAL would have said so.  So they insist that there are no worries.  We’re also in a preliminary consultation phase.  The actual enquete publique for the quarry project is from June 7 to July 7.  Currently, the ODG Cabardes is being sent this information just so we can give a viticultural assessment of the project.  So it’s actually a courtesy call and I do have a lot more time than I originally thought.  We only have a few days to contribute information about how the project may affect the Cabardes appellation, but we’ll have lots of time to talk about the project in June when everybody has a chance to learn about it.

The project is located much closer to Rivals, another Cabardes producer.  I haven’t gotten in touch with Rivals yet but other Cabardes producers alluded to the fact that they might actually be happy about the quarry.  Typically, after 12 years the quarry will be filled with water and turned into a pretty lake that can increase property value and also serve as a water reserve to irrigate nearby crops.  I don’t have any details about how the quarry will be used after the 12 years, but we’ll probably see more information soon.  The other producers concerned are the new owners of Domaine La Mijeanne.  The truck route looks like it goes right by them.  But I don’t know how much that affects the viticulture.  It’s more of a general environmental issue, and that’s not what we’re being consulted about.  A neighbor of mine notes that La Mijeanne, under its previous ownership, successfully fought the installation of a different type of project near their domaine on the grounds that there were environmental issues.  But that was a much more harmful project where materials were treated on site.

I’ve talked to a couple people familiar with quarry projects and they seem to think this current Villemoustaussou quarry project is a very safe installation.  It’s basically a gigantic hole where they’ll get sand and gravel.  The materials will be processed elsewhere (in Valmy) and those installations can have a much more significant impact on the environs.  The Villemoustaussou installation will not be like this. Apparently, there will be no dewatering or any kind of pumps.  All this to be confirmed, but sounds like good news so far.

X